Inundation Prevention at RW 03 of Marunda Urban Village Optimized
Reported by Anita Karyati | Translated by Rizky Mawardi
Cilincing Sub-district's Water Resource Implementer Unit personnel optimizing inundation prevention at RW 03, Marunda Urban Village.
targeted to complete tomorrow
Unit's Field Coordinator, Nandi, the prevention is run by constructing channel crossing at RT 06. Then personnel also repair channel crossing at RT 09 and RT 11.
Channel on Jalan Madrasah Revitalized"The area is often inundated during heavy rain," he said, Monday (3/4).
Nandi explained the channel crossing at RT 06/03, Marunda Urban Village is constructed along 6.5 meters x 100 cm x 80 cm. The channel crossing repair at RT 09/03 is run along 25 meter x 80 cm x 100 cm.
"We also repair channel crossing at RT 11/03 along 25 meter x 70 cm x 100 cm," he added.
According to him, there are 16 personnel deployed to construct and repair the channel crossing.
"The project has been running since February 19, 2024 and is targeted to complete tomorrow," he stated.
Meanwhile, one of RT 11/03 residents, Marunda Urban Village, Deny (40), assessed the channel construction is correct.
"It is hoped the newly repaired channel crossing will be able to accommodate water to prevent inundation," he said.